Vegetation Clearing In November 2011 through January 2012, the Presidio Trust will clear vegetation around Mountain Lake in advance of the Mountain Lake Remediation Project. The purpose of the clearing is to gain access to areas to complete a topographic map, conduct geotechnical studies of Park Presidio Boulevard, and evaluate access routes for future environmental cleanup of the lake. Most brush vegetation will be cleared within a 15-foot wide corridor east of Park Presidio Boulevard. Vegetation and trees will be cleared in the area north of Mountain Lake trail and east of Park Presidio Boulevard where the trail crosses underneath the highway. Some clearing is also required in the northern arm of the lake. Plants that will be removed are primarily non-native species. Limited, short-term closures of Mountain Lake trail will be required for safety during removals. For more information, contact Presidio Trust Public Affairs: (415) 561-5418
November 2011 through January 2012
Mountain Lake
VEGETATION programme is the result of the soil of a space collaboration right around fluctuating European confederates: Belgium, France, Italy, Sweden and the European Commission.
Posted by: casino spelen | February 17, 2012 at 01:43 PM
Said the women's wardrobe is always at least one pair of shoes, when the spring and summer season season, you want to strengthen the Fashion degree Which of the following pairs of shoes dumping?Both high-heeled, flat, fringed boots or sweet flower details, Dachu self Fan children!Short paragraph Hooded Tee plus pantyhose was the basic models with light-colored inside the ride shirt and checkered scarf and coat the same color as a whole lot of extra points.
Posted by: Nike Shoes | July 03, 2012 at 01:30 AM